Skip to main content
Search

Header Menu

  • Main Breaks
  • FAQs
  • Careers
  • Contact Us

Customer Portal

Customer Portal
  • Login or Register
  • Pay Your Bill
  • Start Service
  • Stop Service
Close
Fairfax Water - Official Website

Main navigation

  • Customer Service
    • Start Service
    • Tenants or Landlords
    • Meter Shop
    • Rules & Regulations
    • Rates
    • About Your Bill
    • Payments
    • Stop Service
    • Your Plumbing
    • Detecting Leaks
    • FAQs
    • Avoid Scams
  • Do Business With Us
    • Vendors
    • Developers & Engineers
    • Procurement
  • Our Water
    • Water Quality
    • Water Supply & Source Water Protection
    • Student Project Program
    • Cross-Connection Control & Backflow Prevention
  • News
    • Annual Report on Water Quality
    • Educational Resources
    • Meeting Schedule
    • Water Ninja Adventures
    • Kid's Art
    • Straight From the Tap Newsletter
    • Publications
    • Work Zone
    • Capital Projects
  • About Us
    • Board Members
    • Employment
    • Executive Staff
    • Holiday Calendar
    • Tours
    • Retirees
Project

Water Infrastructure


corroded pipe

Click here to view the Water Main Replacement Map Application

Replacement of aging water infrastructure is a national issue.  A report released by the American Water Works Association, Buried No Longer, stated that infrastructure replacement costs will exceed $1 Trillion by 2035. 

The need for infrastructure replacement is not a new one.  For many years now, the Fairfax Water Board of Directors has dedicated funding to ensure that our infrastructure can be replaced as needed without placing an unusual financial or service burden on our customers.  Analysis is done each year to determine future needs for replacing water mains in the system.  To identify which mains will be replaced a number of factors are considered:

  • Total break history
  • Number of recent breaks
  • Number and type of customers impacted
  • Performance of different types of pipe material
water_damage.png spraying_pipe.png

This comprehensive approach allows Fairfax Water to apply overall asset management principles to the very complex and difficult challenges presented by aging infrastructure.

Below are some key factors that keep Fairfax Water at the top level of service and the bottom of the charts in terms of cost and service disruptions to our customers:

  • From 2015 to 2019, Fairfax Water invested over $89 million to replace distribution water mains that had reached the end of their useful lives.
  • Fairfax Water's distribution system is relatively young.  Over half of our mains (56%) have been in the ground for 30 years or less.  Only 23% of our distribution system was installed in the 1950's and 1960's.  This is one of many reasons our system-wide break rate is the lowest in the region.
  • Even though our system is newer and performing better than many, Fairfax Water's Board and staff recognize the need to effectively manage our underground assets to maintain a high level of service for our customers.  In 2010, Fairfax Water began to look at this issue in a new light by incorporating service levels and other factors in the prioritization of funding for replacement.  Using these factors, we were able to identify a target service level goal and estimate the funding that would be required over the next 75 years to maintain our distribution system performance in line with the top performing water systems in the country. 
  • In 2020, our Distribution System Sustainability program includes design and construction of 37 projects totaling over 11 miles of main, as well as the replacement of an additional mile of water main along Route 7 in the Baileys Crossroads Area.
  • By 2025, the DSS Program annual budget is anticipated to exceed $25 million.
new_large_pipe.png pipe_install.png

 


Other Projects

View All
Dulles Toll Road Crossing at Innovation Center
Project

Dulles Toll Road Crossing at Innovation Center

Last updated: December 2, 2022
Sleepy Hollow Transmission Main
Project

Sleepy Hollow Transmission Main

Last updated: December 2, 2022
Poplar Heights Tank Replacement
Project

Poplar Heights Tank Replacement

Last updated: August 25, 2022
Sleepy Hollow Road Pump Station
Project

Sleepy Hollow Road Pump Station

Last updated: April 23, 2021
Fairfax Water

Footer menu

  • Privacy Disclaimer
  • Rules & Regulations
  • Careers
  • FOIA Requests
  • Miss Utility / 8-1-1
Customer Portal Login

Fairfax Water is exempt from Federal, State and local sales and use taxes (ID # 54-6025290)